Step by step 8 steps
  1. Step 1

    Handler is setup near the brick mark within range of the end zone. The handler will call for an ISO for a primary cutter, who will go to the back of the end zone. other cutters and handlers should stack on either side of the handler, inline or behind them. (2) should be a secondary handler ready to run in place for a dump. (3) should be the best cutter.

    12345671234567
  2. Step 2

    (3) the cutter should run to one side of the endzone to try and get open for the throw.

    12345671234567
  3. Step 3

    (3) the cutter should then run in the opposite direction to be open for the throw into the endzone

    12345671234567
  4. Step 4

    If the endzone cutter is being heavily defended the Handler will look to the other cutters lining up for them to cut into the endzone. The original endzone cutter should exit the endzone to make room for the other cutters.

    12345671234567
  5. Step 5

    Ditto as step 4

    12345671234567
  6. Step 6

    Ditto

    12345671234567
  7. Step 7

    If none of the cutters are open then the secondary handler (2) will look for a dump to reset.

    12345671234567
  8. Step 8