Step by step 5 steps
  1. Step 1

    Set up vert stack

    O1O2O3O4O5O6O7D1D2D3D4D5D6D7
  2. Step 2

    Third guy in the stack makes a cut horizontally into the lane, them makes a sharp 90 degree in cut.

    O1O2O3O4O5O6O7D1D2D3D4D5D6D7
  3. Step 3

    The cutter then makes a sharp cut back into the front of the stack. This is where the throw comes.

    O1O2O3O4O5O6O7D1D2D3D4D5D6D7
  4. Step 4

    The back of the stack comes break side.

    O1O2O3O4O5O6O7D1D2D3D4D5D6D7
  5. Step 5

    The new back of the stack makes a deep cut.

    O1O2O3O4O5O6O7D1D2D3D4D5D6D7