Step by step 4 steps
  1. Step 1

    Verts stack setup with the dump on the force side

    12345671234567
  2. Step 2

    Cut hard to the space 3-5 yards behind the handler. The cut should be approximately perpendicular to the sideline. If this cut is open then you will get a dish to reset the stall count and gain access to the breakside

    12345671234567
  3. Step 3

    If you are covered then the handler will pump fake and you will change directions 180 degree and get the dish from the handler.

    12345671234567
  4. Step 4
    12345671234567