Step by step 6 steps
  1. Step 1

    Standard vertical setup - note the dump is 45 degree behind on the open side - sufficient space to avoid picks near the back of stack is crucial

    12345671234567
  2. Step 2

    2nd back of stack (6) cuts under (reasonably wide) to whichever side he choses

    12345671234567
  3. Step 3

    Back of stack cuts to the opposite side - being sure to avoid picks

    12345671234567
  4. Step 4

    The new back of stack (5) cuts deep

    12345671234567
  5. Step 5

    All three steps should be run much closer to simultaneously though

    12345671234567
  6. Step 6

    Like so

    12345671234567