Step by step 11 steps
  1. Step 1

    Set up in a standard Vertical Stack.

    O1O2O3O4O5O6O7
  2. Step 2

    (4) initiates a lane cut, the stack adjusts by to create space around the cutting lane.

    O1O2O3O4O5O6O7
  3. Step 3

    (1) passes to (4), (5) gets ready for a continuation cut. (6) & (7) now angle away to create space up field and down field for (5).

    O1O2O3O4O5O6O7
  4. Step 4

    (5) continues with cut, the rest of the stack angles away.

    O1O2O3O4O5O6O7
  5. Step 5

    If (5) is not open, (4) looks to reset the disc to (1), the rest of the stack re-positions.

    O1O2O3O4O5O6O7
  6. Step 6

    (4) makes the dump pass to (1). (5) re-joins the stack. The rest of the stack anticipates a swing pass to (2).

    O1O2O3O4O5O6O7
  7. Step 7

    (1) swings the disc to (2). (6) sets up for a continuation cut. The rest of the stack angles away again to create space for the new lane cutter.

    O1O2O3O4O5O6O7
  8. Step 8

    (6) is now the active lane cutter.

    O1O2O3O4O5O6O7
  9. Step 9

    The stack works to keep space open up and down field.

    O1O2O3O4O5O6O7
  10. Step 10

    (6) now has more space to work with.

    O1O2O3O4O5O6O7
  11. Step 11

    Giving (6) plenty of options to set up a deep cut.

    O1O2O3O4O5O6O7